|
Commissioning
Following transportation
to site and the installation of the autoclave, Astell's highly
skilled technicians can:
- Commission
the new equipment
- Include a
calibration check
- Perform a
safety valve function test
- Ensure that
the unit is functioning correctly
IQ/OQ/PQ Validation
Packages
Astell are able
for offer full IQ/OQ/PQ Validation packages including
- User
Requirement Specification (URS)
- Design Specification
/ Technical quotation (DS)
- IQ (Installation
Qualification) OQ (Operational Qualification) PQ (Performance
Qualification)
- Document
package including all required information
Please click
here
for more information
Load Validation
In order to verify
that your loads are being properly sterilised, Astell would
always recommend that the loads are validated. A typical method
would be a 12 Point Thermocouple Validation
The process involves
inserting up to twelve thermocouples into the load so as to
accurately determine that the whole load has reached the set
point temperature and has maintained that temperature for
the desired time.
This work is
carried out to UKAS
standards and all the equipment used is fully traceable to
national standards.
Astell can also
provide quarterly
and annual service and testing in accordance
with HTM2010, carried out by experienced and qualified test
engineers
Please contact
the Service Department directly for a detailed quotation |